Siraf Refineries Park Program is defined with the aim of preventing wholesale gas condensate, creating added value, creating jobs and ensuring maximum profit gain from south pars gas fields. To be built in Boushehr province.

The Siraf Refinery Park has 8 gas refineries, each of them with a capacity of 60,000 BPSD. Javid Energy Parto Company (JEPCo) owner of refinery amongst 8 refineries.

The construction period is planned for 3 years and the production phase is 20 years.

Siraf Refineries Infrastructure Company (S.R.I.C) owned by refinery owners (96%) and oil industry pension fund (OIPC) (4%) is responsible for acquiring licenses, leveling and preparing the land for the whole refinery park.S.R.I.C will provide common utilities and services for all refineries.

Condensate Distillation Unit (CDU), LPG Recovery Unit, Naphtha Hydrotreater Unit (NHT), Middle Distillate Hydrotreating Unit (MDH) and LPG Treating Unit (LPT) and also products tanks.

Utilities are divided to two sections. 1- Common Facilities (provided by SRIC), 2- Other utilities provided by each refineries.

Utility units to be built by individual refinery (JEPCo)

  • Compressed Air & Instrumentation Air unit
  • Demineralized Water System (DWS)
  • Potable Water System (PWS)
  • Desalination water (DSW)
  • Amine Treatment  Unit (ATU)
  • Sulfur Recovery Unit (SRU)
  • Sour Water Stripper (SWS)

Common Facilities to be built by S.R.I.C:

  • Waste Water Treatment unit (WWT)
  • Sea Water intake System (SWIS)
  • Fuel Gas System (FGS)
  • Electricity Supply
  • Flare System

Actual Refinery Progress

  • Part of Land preparation (Done)
  • EPC Contractor Selection (PIDEC Company)
  • MC Contractor selection (Sazeh Company)
  • Acquiring Licenses

Acquired License 

  • Establishment Permit
  • Construction License
  • Environmental License
  • Sea Water Intake License
  • Power Supply Agreement
  • Natural Gas Purchase Agreement
  • Feed supply Agreement in principle

 

Main Activities ahead

  • Gas Redaction station
  • Early Work Activities
  • Completion of Land preparation 
  • Installation of natural gas pipeline and metering station
  • Installation of a perimeter fence and defining customs fence
  • Installation of Temporary channels to collect surface water
  • Establishment of electricity transmission line and substation